SPM Tuition
Subject

SABAH 2023 P2 Q11

Medium

Write your answer on paper. Then open the answer to check it.

  1. The production for sanitizer brand A is related to the number of hours, H, by the equation a = 2x² − b/H, where a and b are constants. The table shows the corresponding values of x (metric tonnes) and H (hours): H = 30, 60, 90, 120, 150, 180; x = 0.6831, 0.6583, 0.6146, 0.6191, 0.6000, 0.6055. (a) Plot a graph of x²H against H, using a scale of 2 cm to 30 hours on the horizontal axis and 2 cm to 10 units on the vertical axis. Hence, draw the line of best fit. (b) Use the graph in (a) to find the value of a and of b. (c) From the graph, estimate the production of sanitizer brand A if the number of hours needed is 45.

    Medium10 marks
    1. (a)

      Plot x²H against H (2 cm : 30 hours; 2 cm : 10 units) and draw the line of best fit.

      [4]
    2. (b)

      Use the graph to find the value of a and of b.

      [5]
    3. (c)

      Estimate the production if H = 45.

      [1]