PERAK 2022 P1 Q3
MediumWrite your answer on paper. Then open the answer to check it.
Diagram 3 shows part of the Klang Valley rail transit map on a Cartesian plane. A new straight rail is built so that any point on it is always equidistant from Chow Kit station (−1.5, 2.5) and Ampang Park station (2, 4). Batu Caves station is at (−4, 12) and Dang Wangi station is at (2.5, −2).
Medium6 marks
- (a)
Find the locus of the future rail.
[4] - (b)
Between Batu Caves Station and Dang Wangi Station, which station will the new rail pass through? Justify your answer.
[2]