# 1.2 Inverse Variation

SPM Form 5 Mathematics (KSSM) · Chapter 1 Variation. Interactive version with diagrams: https://spmtuition.com/math/form-5/chapter-1-variation/1-2-inverse-variation/

## Constant product

If y varies inversely as x, write y = k/x. Then xy = k, where x ≠ 0.

*Graph of y = k/x: Change k. At every point on the curve, xy = k.* (interactive on the web page)

| Relationship | Equation |
| --- | --- |
| y varies inversely as x² | y = k/x² |
| y varies inversely as √x | y = k/√x |

For positive k and x, increasing x reduces y. A graph of y against 1/x is straight through the origin.

**Worked example:** y varies inversely as x. y = 8 when x = 3. Find y when x = 6.

1. k = xy = 3 × 8 = 24
2. y = 24/x
3. At x = 6, y = 24/6

**Answer:** 4

### Practice questions: Constant product

1. For inverse variation y ∝ 1/x, which is constant?
   A. xy
   B. x + y
   C. y/x
   D. x − y
   **Answer:** A. xy. Multiplying y = k/x by x gives xy = k.

2. y = 5 when x = 4 and y ∝ 1/x. Find y at x = 10.
   A. 12.5
   B. 2
   C. 20
   D. 50
   **Answer:** B. 2. k = 20, so y = 20/10.

3. If y ∝ 1/x², tripling x multiplies y by
   A. 3
   B. 9
   C. 1/9
   D. 1/3
   **Answer:** C. 1/9. The denominator increases by 3².

4. Which plot is linear through the origin for y = k/x?
   A. y against x
   B. y against x²
   C. y against √x
   D. y against 1/x
   **Answer:** D. y against 1/x. Treat 1/x as the horizontal variable.

## Interpret scaling

*Graph of y = 16/x²: Doubling x quarters y when y = 16/x².* (interactive on the web page)

For y ∝ 1/x², doubling x quarters y. Check the power before scaling.

**Worked example:** Four identical pumps empty a tank in 9 hours. Find the time for six pumps at equal rates.

1. Time varies inversely as the number of pumps
2. k = 4 × 9 = 36 pump-hours
3. Time = 36 ÷ 6

**Answer:** 6 hours

> **Exam tip:** The pump model assumes equal rates and no interference between pumps.

### Practice questions: Interpret scaling

1. Six workers take 8 days. How long for 12 equal-rate workers?
   A. 4 days
   B. 16 days
   C. 8 days
   D. 2 days
   **Answer:** A. 4 days. The fixed work is 48 worker-days; 48/12 = 4.

---

Online SPM tuition for Physics, Chemistry, Biology, Mathematics and Additional Mathematics, Form 4–5, in English or BM. Students who want tuition or extra help can request it at https://spmtuition.com/tuition/.