SPM Tuition
Subject

NEGERI SEMBILAN 2024 P2 Q17

Hard

Write your answer on paper. Then open the answer to check it.

  1. Burhan wants to build a model house like Diagram 10.1. He has measured and sketched the house just like the drawing on Diagram 10.2 (a cube and a prism with an isosceles triangle base; 4 m, 1 m and 5 m labelled). Answer one question from Section C (Questions 16 and 17); both are indexed.

    Hard15 marks
    Diagram for question 110
    1. (a)

      To facilitate the construction of the model house, Burhan needs to obtain a plan for the model. By using the scale 1 : 100, draw a plan for Diagram 10.2.

      [3]
      Diagram for question 110 (a)
    2. (b)

      Burhan wants to use a cardboard for the roof of that house model. Therefore, he needs to draw the roof's net on the cardboard to be cut. Draw the roof net on the answer space.

      [3]
      Diagram for question 110 (b)
    3. (c)(i)

      Next, Burhan wants to use several of those house models in a diorama as shown in Diagram 10.3. The number of house models is represented by x and the number of tree models by y. The total number of house and tree models does not exceed 90. The number of tree models is at least twice the number of house models. Given the cost to build a house model is RM1 and the cost to build a tree model is RM0.50. Burhan has allocated a budget of at least RM50 for the cost of house and tree models. Write three linear inequalities, other than x ≥ 0 and y ≥ 0, that represent the situation.

      [3]
      Diagram for question 110 (c)(i)
    4. (c)(ii)

      By using a scale of 2 cm to 20 units on the x-axis and 2 cm to 10 units on the y-axis, draw and shade a region that satisfies the above linear inequality system on the graph provided in the answer space (Graph for Question 17(c)(ii), blank graph paper).

      [4]
      Diagram for question 110 (c)(ii)Diagram for question 110 (c)(ii)
    5. (c)(iii)

      Burhan can build a model of a house in 45 minutes, while a model of a tree takes 5 minutes. Calculate the number of house and tree models that can be completed in the minimum time.

      [2]