SPM Tuition
Subject

SMKA, SABK SET 1 2023 P1 Q14

Easy
  1. In an innovation project, 5 students were assigned to build a 3D office model. The time required is 4 days. Given time, t varies inversely as the number of students, n. Calculate the time, in days, needed if the number of students is doubled.

    Easy