SPM Tuition
Subject

PAHANG 2025 P2 Q11

Hard

Write your answer on paper. Then open the answer to check it.

  1. A contractor builds a curved skateboard ramp at a sports school. Diagram 6 shows the cross-section of the curve of the ramp drawn on a Cartesian plane, where y is the vertical distance of the player from the ground and x is the horizontal distance of the player from the y-axis. The ramp has a height of 8 metres above ground level and has handrails at both ends that are 20 metres apart. The gradient function of the curve forming the ramp is (4/25)x. (a) Determine the equation of the curve represented by the skateboard ramp. (b) Calculate the area bounded by the curve of the skateboard ramp and y = 8. (c) For a long term plan, the ramp will be modified into a covered structure and used as a water storage tank. Calculate the maximum volume of water, in terms of π, when the region bounded by the curve y = f(x), the straight line y = 8 and the y-axis is rotated through 360° about the y-axis.

    Hard10 marks
    Diagram for question 131
    1. (a)

      Determine the equation of the curve represented by the skateboard ramp.

      [3]
    2. (b)

      Calculate the area bounded by the curve of the skateboard ramp and y = 8.

      [4]
    3. (c)

      Calculate the maximum volume of water, in terms of π, when the region bounded by the curve y = f(x), the straight line y = 8 and the y-axis is rotated through 360° about the y-axis.

      [3]