SPM Tuition
Subject

TERENGGANU 2025 P2 Q13

Medium

Write your answer on paper. Then open the answer to check it.

  1. A factory wants to hire new employees for the positions of supervisors and operators. Money amounting to RM32 000 has been allocated for the monthly salary payment of employees. The salary of a supervisor and an operator is RM600 and RM400 per month respectively. The number of operators must exceed the number of supervisors by 10 or more. The number of supervisors should be at least 10% of the number of operators. Given that x represents the number of supervisors and y represents the number of operators. (a) The shaded region on the graph on page 31 represents one of the constraints. Write an inequality to represent the constraint. (b) Write two inequalities other than (a), x ≥ 0 and y ≥ 0 that satisfy all the above constraints. (c) Using a scale of 2 cm to 5 people on the x-axis and 2 cm to 10 people on the y-axis, construct and label the region R that satisfies all the above constraints. (d) Using the graph constructed in (c), answer: (i) the maximum number of employees that can be hired by the factory if the number of supervisors is 10% of the number of operators; (ii) the factory will pay an overtime allowance of RM8 per hour for an operator and RM16 per hour for a supervisor. By drawing the objective function line, find the maximum amount of overtime allowance per hour to be paid by the factory.

    Medium10 marks
    Diagram for question 76
    1. (a)

      Write an inequality to represent the constraint shown by the shaded region on the graph.

      [1]
    2. (b)

      Write two inequalities, other than (a), x ≥ 0 and y ≥ 0, that satisfy all the above constraints.

      [2]
    3. (c)

      Using a scale of 2 cm to 5 people on the x-axis and 2 cm to 10 people on the y-axis, construct and label the region R.

      [3]
      Diagram for question 76 (c)
    4. (d)(i)

      Maximum number of employees that can be hired if the number of supervisors is 10% of the number of operators.

      [1]
    5. (d)(ii)

      By drawing the objective function line k = 16x + 8y, find the maximum amount of overtime allowance per hour.

      [3]